4 November 2022

Representatives of Geofit and Radius-Service Product Centers attended the International ADIPEC-2022 Exhibition for the first time, sharing a stand.

ADIPEC is one of the largest and most anticipated events within the oil and gas community and represents an important international platform for interaction with partners and customers from the Middle East and North Africa.

Our high-tech integrated BHA with LWD tools and RSS, that has a high potential for deployment in the region, generated much interest at the exhibition.

Recommended

4 August 2026 New record achieved with InnoSprint Triple Combo BHA

InnoSprint high-speed telemetry system produced by Geofit is undergoing extensive field testing as a part of high-tech Triple Combo BHA. InnoSprint is a proven local solution, competitive with industry-recognized telemetry tools.

At Mamontovskoye field InnoSprint has demonstrated record-to-date reliability performance. 100% Russian Triple Combo BHA (InnoSprint + SIB-R + Energia + RuLink + RSS) has drilled 2,027 meters of the horizontal section. An absolute record of 368 total circulation hours was achieved in one run. A data transmission rate of 6 bits per second ensured high-quality logging data. InnoSprint is a unique fit-for-basin technology of Geofit Product Center ensuring stability of directional drilling service.

We are proud of the cutting-edge technologies developed by Geofit Product Center and pleased to offer this long-awaited solution to our Customers.

28 December 2022 First Commercial Job of SIB-R 4 3/4", Russian High-Tech EM Wave Propagation Resistivity Tool

After multiple field tests of the 121-mm SIB-R tool combined with reference EM wave propagation resistivity tools, the first commercial job was performed at the Chayandinskoye Oil and Gas Condensate Field in East Siberia.
Over 3,250 meters were drilled, and more than 270 hours of circulation were accumulated when drilling a multi-lateral horizontal well.
The well was drilled with no incidents. Phase Shift and Attenuation resistivity measurements acquired while drilling were timely provided to the customer to make critical geosteering decisions in real-time and perform formation evaluation using tool memory data.